Flooring & tile subcontractor · Tampa Bay + Orlando

Commercial flooring and tile. What's on paper gets done.

Rocky Remodeling self-performs commercial tile, large-format porcelain, carpet tile, demo and floor prep for general contractors across Florida. Fully insured. W-9 and COI ready. Crew that travels.

Sand Lake IV lobby after completion — two-tone large-format porcelain floor with a curved inlay, seen from the mezzanine
HQ · Sand Lake IV, Orlando — lobby, all restrooms, carpet tile
  • Fully insuredGeneral liability · COI issued to the GC
  • 20+ yearsFounding team, 500+ projects
  • Tampa · OrlandoStatewide when the job calls for it
  • Daily photosCompanyCam documentation on every job

Why GCs call us

Three problems we're built to take off your plate

Rework

"The last flooring sub cost me two weeks and a change order."

Floor prep, self-leveling and layout done before a single tile goes down. Written scope, then the scope gets built. You inspect once.

A sub, now

"I have a restroom package starting Monday and no tile crew."

Tampa and Orlando crews, and we've mobilized to Pompano Beach for Topgolf. Send the scope; you get a yes or no and a start date, not a maybe.

Too many trades to manage

"I don't want four subs in one restroom."

Demo, floor prep, tile, drywall patch, paint and base under one contract and one superintendent contact. Fewer hand-offs, fewer gaps.

Scope we self-perform

Flooring first. Finishes that go with it.

Flooring & tile

  • Floor and wall tile — restrooms, lobbies, corridorsceramic · porcelain
  • Large-format porcelain with inlays and patternslobbies
  • Carpet tileoffice floors
  • Demo of existing finishestile · carpet · base
  • Floor prep and self-levelingbefore every install

Finishes we bundle

  • Drywall repair and patchingpost-demo
  • Paintingrestrooms · corridors
  • Baseboard and trim
  • Door installation
  • Bathroom and kitchen build-outstenant improvement

Commercial work

Buildings you know. Scopes you can verify.

Three recent jobs with full photo documentation, then the rest of the commercial track record. Every project has a reference behind it — ask for the contact and we send it the same day.

2025→ early 2026

HQ · Sand Lake IV

7380 W Sand Lake Rd, Orlando — lobby, elevator lobbies, all restrooms, carpet tile

Demo of existing finishes, floor prep and self-leveling across the full lobby, then two-tone large-format porcelain laid to a curved inlay that runs from the atrium through the elevator lobby. Leveling clips on every tile.

Lobby floor freshly self-leveled, elevators taped off, before tileLarge-format porcelain being set with leveling clips along the curved inlay lineElevator lobby with new two-tone porcelain set and clippedFinished lobby with furniture in place on the new porcelain floor
Year TBC

Macy's · Altamonte Mall

Altamonte Springs — mattress & furniture sales floor

Polished porcelain walkways set through an occupied department store — existing flooring demoed, leveling clips on every tile, store trading again with the aisle open.

Sales floor demoed to slab, first run of polished porcelain aisle set with leveling clipsLong run of polished porcelain aisle tiles with leveling clips, walls protected with plasticPolished porcelain aisle turning the corner around a column, leveling clips in placeFinished polished porcelain aisle between mattress and furniture displays, store open
2026

DTCC · Tampa

18301 Bermuda Green Dr, Tampa — restrooms and break room

Restroom package from cement board up: large-format dark porcelain floors, glazed subway walls, and vertical-stack tile wrapped around a curved column with a recessed niche. Break room feature wall in textured glazed tile. Performed for Resource Flooring & Maintenance.

Restroom before tile — cement board walls and a curved column with a niche cut inVertical-stack tile being wrapped around the curved column with spacers in placeFinished vanity wall and curved column in vertical-stack tile, dark porcelain floorBreak room feature wall in textured glazed tile above a granite counter

Track record

More commercial projects completed

Photo documentation predates our CompanyCam process on some of these. References available for every one.

2025Raymond James StadiumTampaRestroom tile and carpet — ~20,000 sf of flooring installed
2022Chase Tampa Headquarters CampusTampaRestroom renovation, 6 buildings × 4 floors × 2 restrooms — ~400 sf floor tile and ~1,000 sf wall tile per restroom
2025Fifth Third BankMultiple branches, FloridaRestrooms and flooring across several branch locations
2025USF St. PetersburgSt. PetersburgRestroom renovation
2025Topgolf Pompano BeachPompano BeachRestrooms — crew mobilized out of market for the duration of the job
2016ONE St. PetersburgCondominium high-rise, St. PetersburgAll lobbies, corridors and the clubhouse
2026MUFG4050 W Boy Scout Blvd, TampaCommercial tile — performed for Resource Flooring & Maintenance
2026Morgan Stanley390 N Orange Ave, OrlandoCommercial tile — performed for Resource Flooring & Maintenance
2026CIBC100 N Tampa St, TampaCommercial tile — performed for Resource Flooring & Maintenance
2026Broadway Promenade Condominium1064 N Tamiami Trl, SarasotaCommercial tile — performed for Resource Flooring & Maintenance
2026Sounds for Seniors3000 Bayport Dr, TampaCommercial tile — performed for Resource Flooring & Maintenance

Reference & paperwork

Call before you award. We'd rather you did.

Resource Flooring & Maintenance

Commercial & institutional flooring contractor, Tampa — Rocky performs commercial tile work for them.

Ask for Matt Moran, Project Manager / Superintendent.

(813) 785-7393

In the bid package, on request

  • Certificate of Insurance — general liability, GC listed as additional insured
  • W-9
  • Project references with contact names and phone numbers
  • Photo documentation of comparable scopes (CompanyCam)

Rocky Remodeling works as a subcontractor under the general contractor's license and permits.

How a job runs with us

From ITB to closeout

1

ITB received

You get a go / no-go within 48 hours. If we can't hold your schedule, we say so up front.

2

Site walk + takeoff

We walk it, measure it, and flag substrate issues before the number, not after.

3

Written proposal

Scope, exclusions, schedule and payment terms in writing. No verbal scope.

4

Install

Daily CompanyCam photos shared with your super. One Rocky contact on site.

5

Closeout

Punch walked together, one visit. Then we ask for the next one.

Send it over

Have a flooring or restroom package? Send the scope.

Plans, an ITB, or three sentences and a start date — any of it works. Reply comes from Marcos, who will run the job.

Call · ask for Marcos(813) 834-1751
Bids & documentsinfo@rockyremodeling.com

Attach plans by replying to our confirmation email, or send them straight to info@rockyremodeling.com.